1-Review project scope, goals feasibility and EIA.
2- Set project plan, estimated cost and prepare project budget
3-define needed resources and capabilities
4-Set project execution process and operations
5-Define project’s outcome and conformity to plan -
التصميم والهندسة
التصميم والهندسة
1-Validate project process, operating units and HSEQ. 2-define technical standards, controls and operating practices
3- Review construction drawings, installation guidelines and project supervision
4-Estimate materials and equipment , specifications, and installation schedules
5-Generate commissioning, start-up and handover procedures -
الإدارة والإشراف PMS
الإدارة والإشراف PMS
1-Validate project process, operating units and HSEQ. 2-define technical standards, controls and operating practices
3- Review construction drawings, installation guidelines and project supervision
4-Estimate materials and equipment , specifications, and installation schedules
5-Generate commissioning, start-up and handover procedures -
إعداد مستندات العروض
إعداد مستندات العروض
1-Define project construction plan & construction capabilities
2-Qualify available contractors, offialization and establish communication
3-Generate project bid documents and obtain ITT
4-Review bids and establish short listing, verifications, payment schemes and final bidding
5-Generate bid selection, laying project contracts, site release, construction kick-off. -
شراء المعدات ومستلزمات المشروع
شراء المعدات ومستلزمات المشروع
1-Define needed materials, equipments, tools and project procurement budget and plan
2-Qualify available suppliers, manufacturers, inspections, verifiers and QAQC
3-Obtain ITT from suppliers, general costing and perform lay-out of selection and procurements
4-Schdule materials and equipment shipment, arrival, transport and site warehousing and storing -
تنفيذ وبناء منشآت ومعدات المشروع
تنفيذ وبناء منشآت ومعدات المشروع
1-Define needed materials, equipments, tools and project procurement budget and plan
2-Qualify available suppliers, manufacturers, inspections, verifiers and QAQC
3-Obtain ITT from suppliers, general costing and perform lay-out of selection and procurements
4-Schdule materials and equipment shipment, arrival, transport and site warehousing and storing -
ما قبل التشغيل والتشغيل
ما قبل التشغيل والتشغيل
1-Develop Pre-commissioning organization, operating procedures and HSEQ guidelines
2- Review installed equipment serviceability, client /vendors operating manuals and QAQC.
3-Test run equipment, evaluate performance and re-establish global process
4-Load equipment and test run and verify plant operations, define mishaps and debug list mend same. debug list -
بداية التشغيل الفعلي
بداية التشغيل الفعلي
1-Arrange for start up joint meetings with operating and construction head personnel and review HSEQ 2-Verify all debug, short list repairs and replenishments and establish plant units serviceability and QCQA
3- Establish availability of process fluids, controls, conduits and coordinate with plants premises
4-Load and operate equipment, verify performance along process lines, adjust as needed, and stabilize process
5-Introduce operating personnel to the operations and release contractor personnel to process guarantee. 6-Define client acceptance and establish documents and official handover of plant to client.
للتواصل معنا
رقم
+ 218 91 220 31 59
البريد الالكتروني
info@amial.com.ly
رقم الهاتف
+ 218 91 220 31 59
البريد اللالكتروني
info@amial.com.ly
العنوان
مبنى أمانة الدور الرابع مركز المدينة شارع الوادي ساحة بالخير - طرابلس، ليبيا
العنوان
مبنى أمانة الدور الرابع مركز المدينة شارع الوادي ساحة بالخير - طرابلس،لييبيا